Hello,
I am using a Bruker DRX spectrometer (300 MHz) and a BBO probe (100 mm
sample diamater). I am interested in decoupling the 31P channel while
applying a spin lock on the 1H. I cannot find information on the rf
rating of the probe and what are he safe rf, duty cycle and time
duration limits. I have come across that it is possible to
simultaneously decouple f2 and f3 wile observing f1, but I am looking
for some suggestions as to the best way to approach this .
Best regards
Sabieh Anwar
UC Berkeley
This archive was generated by hypermail 2b29 : Wed Dec 26 2007 - 09:47:03 PST