simultaneous spin lock and decoupling

From: Sabieh Anwar (sabieh@waugh.cchem.berkeley.edu)
Date: Fri Mar 23 2007 - 11:52:08 PDT


Hello,

I am using a Bruker DRX spectrometer (300 MHz) and a BBO probe (100 mm
sample diamater). I am interested in decoupling the 31P channel while
applying a spin lock on the 1H. I cannot find information on the rf
rating of the probe and what are he safe rf, duty cycle and time
duration limits. I have come across that it is possible to
simultaneously decouple f2 and f3 wile observing f1, but I am looking
for some suggestions as to the best way to approach this .

Best regards

Sabieh Anwar
UC Berkeley



This archive was generated by hypermail 2b29 : Wed Dec 26 2007 - 09:47:03 PST